R91 — μ Phase 4 Staging — Verification (Step 5 of 5)

Step 5 of the 5-step chain for β task db30d6c2-a751-443e-b71c-9515ce33f8cd.

This document is the verification evidence that Step 4 (p4.1-mu-integrity.md) satisfies the behavioural contract from Step 2 and the execution plan from Step 3, plus the post-merge consistency assertion against the R91A-ratified canonical roadmap.


1. Test gate

Ran the full three-gate sequence in the rebased worktree (feature/r91-mu-phase-4-staging on top of origin/main = ca9cbda1):

npm run build && npm run lint && npm test

1.1 Build

> colibri@0.0.1 build
> tsc

> colibri@0.0.1 postbuild
> node scripts/copy-migrations.mjs

copy-migrations: copied 8 migration(s) E:\AMS\.worktrees\claude\r91-mu-phase-4-staging\src\db\migrations -> E:\AMS\.worktrees\claude\r91-mu-phase-4-staging\dist\db\migrations

Result: PASS (exit code 0).

1.2 Lint

> colibri@0.0.1 lint
> eslint src

Result: PASS (zero errors, zero warnings).

1.3 Test

First run hit 4 pre-existing flakes documented in R91A T3 report (parallel-migration prefix collision in src/__tests__/domains/reputation/tools.test.ts, consensus parity G7.1 perf budget). Retry:

Test Suites: 69 passed, 69 total
Tests:       3102 passed, 3102 total
Snapshots:   0 total
Time:        30.303 s, estimated 45 s
Ran all test suites.

Result: PASS — 3102/3102 across 69 suites, zero regression vs main ca9cbda1 baseline (R91 ships zero src/ deltas).

1.4 Combined gate

All three gates pass. Docs-only round; the green result confirms the worktree drift relative to main is purely documentation.

2. Coverage matrix (every spec section → ≥1 slice; every slice → ≥1 spec source)

2.1 Forward — μ spec surface → covering slice(s)

Spec section Source Covered by slice
Advisory record schema (8 fields) integrity.md L129-146 + s14 §Output P4.1.1
Circular logic detection (DFS) integrity.md §1 (L22-55) + s14 §Detections > Circular logic P4.2.1
Coercion trap detection (option-set) integrity.md §2 (L57-85) + s14 §Detections > Coercion traps P4.2.2
Axiom drift (sliding window) integrity.md §3 (L87-115) + s14 §Detections > Axiom drift P4.2.3
Axiom regression (per-AX semantic check) integrity.md L108-113 (separate path from §3 cumulative drift) P4.2.3 (separate code path per design invariant 9)
AX-01..AX-07 invariants (constitution) constitution.md AX-01..AX-07 P4.2.3 (one regression case per axiom in parity corpus)
Three advisory roles (Translator/Sentinel/Guide) integrity.md §Three advisory roles (L117-127) + s14 §Advisory roles P4.3.1
Escalation FSM (PASS/WARN/BLOCK/HARD BLOCK) integrity.md §Escalation mapping (L148-157) + s14 §When advisory becomes enforcement P4.4.1
Three invariant mappings (circular→rule, coercion→admission, drift→governance) s14 L38-43 + integrity.md L148-157 P4.4.1
mcp_advisories table (Phase 0 stub → Phase 4 active) integrity.md §Phase 0 posture (L165-170) + §Phase 4 scope (L172-178) P4.5.1
MCP tool surface (Phase 4 activates) integrity.md L174 + Phase 4 scope §future P4.6.1
Test corpus + FP rate profiles (< 1% / < 5% / < 10%) integrity.md §1 + §2 + §3 declared profiles P4.7.1
Fork-hook subscriber (POST_FORK invariant sweep) integrity.md L177 + consensus.md §Interaction with ι + P3.9.1 ForkHookRegistry P4.8.1
Determinism + Lamport invariants θ design invariants 2, 4 (inherited) All slices (enforced via design-invariant list §Design invariants)

Forward coverage: 14 spec rows × ≥1 slice each. Zero spec orphans.

2.2 Reverse — slice → spec sources cited

Slice Primary spec citations
P4.1.1 integrity.md L129-146 (envelope) + s14 §Output (envelope) — R91 audit Q6 (severity), Q7 (hash formula)
P4.2.1 integrity.md §1 Circular logic L22-55 (DFS pseudocode) + s14 §Detections > Circular logic
P4.2.2 integrity.md §2 Coercion trap L57-85 (option-set pseudocode) + s14 §Detections > Coercion traps
P4.2.3 integrity.md §3 Axiom drift L87-115 (sliding-window pseudocode + AX regression at L108-113) + constitution.md AX-01..AX-07 + s14 §Detections > Axiom drift
P4.3.1 integrity.md §Three advisory roles L117-127 + s14 §Advisory roles
P4.4.1 integrity.md §Escalation mapping L148-157 + s14 §When advisory becomes enforcement L38-43
P4.5.1 integrity.md §Phase 0 posture L165-170 (table stub) + §Phase 4 scope L172-178 (activation)
P4.6.1 integrity.md §Phase 4 scope L172-178 (tool surface) + Zod v3.23 / registerTool precedent in src/tools/{consensus,reputation}.ts
P4.7.1 κ P1.5.5 parity-harness precedent + θ P3.8.1 multi-scenario precedent + integrity.md §1/§2/§3 FP profile declarations
P4.8.1 integrity.md §Phase 4 scope L177 (fork awareness) + consensus.md §Interaction with ι (θ fork-hook surface) + P3.9.1 ForkHookRegistry (R89 Phase B #245)

Reverse coverage: every P4.X.Y slice cites ≥1 spec source. Zero free-floating slices.

3. Roadmap consistency check

docs/guides/implementation/task-breakdown.md §Phase 4 was ratified in predecessor R91A (PR #249, merged at ca9cbda1). Confirming 1:1 consistency between the canonical roadmap and the staging file:

Property Roadmap (task-breakdown.md §Phase 4 @ ca9cbda1) Staging file (p4.1-mu-integrity.md @ this PR) Match?
Slice count 10 (P4.1.1, P4.2.1, P4.2.2, P4.2.3, P4.3.1, P4.4.1, P4.5.1, P4.6.1, P4.7.1, P4.8.1) 10 (same IDs)
P4.1.1 title Advisory Record Schema + Envelope Advisory Record Schema + Envelope
P4.2.1 title Circular Logic Detector (DFS) Circular Logic Detector (DFS)
P4.2.2 title Coercion Trap Detector (option-set) Coercion Trap Detector (option-set)
P4.2.3 title Axiom Drift Tracker (sliding window) Axiom Drift Tracker (sliding window)
P4.3.1 title Three Advisory Roles (Translator/Sentinel/Guide) Three Advisory Roles (Translator/Sentinel/Guide)
P4.4.1 title Escalation FSM (4-result + 3 invariant mappings) Escalation FSM (4-result + 3 invariant mappings)
P4.5.1 title Advisory Persistence (mcp_advisories migration) Advisory Persistence (mcp_advisories migration)
P4.6.1 title μ MCP Tool Surface (≥4 tools) μ MCP Tool Surface (≥4 tools)
P4.7.1 title Test Corpus + Parity Harness Test Corpus + Parity Harness
P4.8.1 title Fork Hook Subscriber (post-fork invariant sweep) Fork Hook Subscriber (post-fork invariant sweep)
Effort labels S, M, M, L, M, M, S, M, L, S S, M, M, L, M, M, S, M, L, S
Dep edges (key sample) P4.2.1 depends on P4.1.1 + P0.7.1 + P1.2.4 P4.2.1 depends on P4.1.1 + ζ P0.7.1 + κ P1.2.4
Dep edges (P4.8.1 → θ) P4.8.1 depends on P4.2.3 + P3.9.1 P4.8.1 depends on P4.2.3 + P4.5.1 (added — needed for persist) + θ P3.9.1 ✓+ (super-set; persistence dep is implicit via writing to mcp_advisories)
P6.3.1 dep target P4.4.1 (R91A correction) (out of scope for this file; verified in task-breakdown.md L1179) ✓ (roadmap-side)
Task Summary L1249 row P4 μ Integrity \| 10 tasks \| 3-4 weeks \| P1, P2, P3 10 slices, 4 waves, ~3-4h AI pace / ~3-4w human pace
Total L1253 71 tasks, 26-34 weeks (verified in roadmap; staging file is consistent)
Mermaid graph dep edges All P4.X.Y nodes and edges declared L1291-1319 Matches staging file Wave structure §Wave structure

Consistency: 10/10 slices match by ID, title, effort label, primary dep edges. Total roadmap: 71 tasks, 26-34 weeks (post-R91A ratification). Phase 4 row: 10 tasks, 3-4 weeks, depends on P1+P2+P3.

4. ADR posture check

ADR Status pre-R91 Status post-R91 Changed by R91?
ADR-002 (VRF) PROPOSED PROPOSED No (μ does not consume VRF; not affected)
ADR-003 (BFT library) PROPOSED PROPOSED No (μ subscribes to θ events; not affected by BFT library choice)
ADR-005 (multi-model defer) ACCEPTED ACCEPTED No (μ uses Claude only in Phase 4)
ADR-006 (concept maturity) ACCEPTED ACCEPTED No (μ stays colibri_code: none until Phase 4 close PR)

ADR posture: unchanged. R91 staging adds no new ADR and modifies no existing ADR. The staging file’s §ADR posture section accurately records all four statuses.

5. Self-consistency check (diff stat)

git diff --stat origin/main..HEAD confirms only the 6 expected files shipped:

docs/audits/r91-mu-phase-4-staging-audit.md            | 211 ++++
docs/contracts/r91-mu-phase-4-staging-contract.md      | 168 +++
docs/packets/r91-mu-phase-4-staging-packet.md          | 223 +++
docs/guides/implementation/task-prompts/p4.1-mu-integrity.md  | 2046 +++++
docs/guides/implementation/task-prompts/index.md       |  +21 / -2
docs/verification/r91-mu-phase-4-staging-verification.md      | this file
Expected file Status
docs/audits/r91-mu-phase-4-staging-audit.md ✓ Step 1 (commit 7e5dc2c4 post-rebase)
docs/contracts/r91-mu-phase-4-staging-contract.md ✓ Step 2 (commit 81ec3fa8 post-rebase)
docs/packets/r91-mu-phase-4-staging-packet.md ✓ Step 3 (commit c689edd8 post-rebase)
docs/guides/implementation/task-prompts/p4.1-mu-integrity.md ✓ Step 4 (commit 01618ec2) — new
docs/guides/implementation/task-prompts/index.md ✓ Step 4 (same commit) — +21/-2
docs/verification/r91-mu-phase-4-staging-verification.md ✓ Step 5 (this commit)

6 files total (the staging file + index.md are co-committed in Step 4, matching the packet §2 manifest). Zero src/* touched. Verified via git diff --stat origin/main..HEAD -- src/ returning empty.

6. Predecessor ratification note

The R91 packet §7 originally stated:

“The 2-task task-breakdown row is not amended in R91 (out of scope per the dispatch packet’s ‘no task-breakdown.md mutation’ forbid; flagged in audit §Q4 for a separate hygiene round).”

That statement reflected the state of the world at the moment Step 3 (packet) was authored. It was superseded by predecessor R91A (PR #249, merged at ca9cbda1), which ratified the 10-slice expansion in the canonical roadmap before this PR opened.

After this PR merges:

  • task-breakdown.md §Phase 4 (in main) = 10 entries (P4.1.1 → P4.8.1)
  • p4.1-mu-integrity.md (newly added) = 10 entries (same IDs, titles, effort labels, dep edges)
  • Task Summary L1249 = P4 μ Integrity | 10 tasks | 3-4 weeks | P1, P2, P3
  • Total L1253 = 71 tasks, 26-34 weeks
  • The staging file and the canonical roadmap are 1:1 consistent.

The R91 packet §7’s stale “2-task” framing is corrected here for the audit trail. No edit to the packet was made — the packet is a Step 3 artifact that should reflect the state at its writing, with this verification doc explaining the subsequent change.

7. Forbiddens upheld

Cross-referencing every forbidden from packet §12:

Forbidden Status
--no-verify, --amend, --force-push ✓ Not used; commits clean; rebase fast-forwarded
Main edits ✓ Worktree-only; main checkout untouched
Touching any source code (src/**) ✓ Zero src/* deltas; verified via git diff --stat origin/main..HEAD -- src/
Modifying κ/λ/θ frontmatters ✓ No concept docs touched
Advancing μ to colibri_code: partial ✓ μ stays colibri_code: none (concept doc docs/3-world/physics/enforcement/integrity.md untouched); per ADR-006, graduation reserved for Phase 4 close PR
ADR-002 / ADR-003 / ADR-005 / ADR-006 mutations ✓ All four ADRs untouched
Mutating task-breakdown.md §Phase 4 ✓ R91 is purely staging-file work; task-breakdown.md was ratified separately in R91A
Inventing new ADRs for μ ✓ No new ADRs
Dispatching any Phase 4 slice in R91 ✓ Staging file frontmatter is status: staged (NOT ready); no slice work performed
Status staged must remain staged (NOT ready) ✓ Frontmatter L7 verified: status: staged

All 10 forbiddens upheld.

8. Sign-off

Criterion Result
Step 4 file (p4.1-mu-integrity.md) exists and is 2046 lines
10 per-slice §entries present (P4.1.1 → P4.8.1)
Frontmatter status: staged, colibri_code unset (not graduating)
Index.md updated with Phase 4 section + “After Phase 0” Phase 4 row
Coverage matrix forward (spec → slice) + reverse (slice → spec) complete
Roadmap consistency (10/10) with task-breakdown.md §Phase 4 post-R91A
ADR posture unchanged
6-file diff stat (3 chain docs + staging + index + this doc)
Zero src/ deltas
npm run build && npm run lint && npm test pass (3102/3102 across 69 suites)
All packet §12 forbiddens upheld
Predecessor R91A (PR #249, ca9cbda1) acknowledged

All 12 sign-off criteria met. Step 5 verifies Step 4. R91 5-step chain closed.

9. Residual risks / blockers for PM

  1. status: staged (NOT ready). This file remains gated on explicit T0 mandate before any P4.X.Y slice dispatches (mirrors R89.B λ staging gate flipped at R89 Phase A, R89.C θ staging gate flipped at T0 autonomous Phase 2+3 mandate).

  2. All upstream axes (κ Phase 1, λ Phase 2, θ Phase 3, ζ/η/β/α Phase 0) already ship at main HEAD ca9cbda1. Zero unmet upstream blockers — only T0 confirmation remains as the soft gate.

  3. Phase 4 close PR (not in this round) is the surface that:
    • graduates μ from colibri_code: nonepartial per ADR-006
    • updates CLAUDE.md §10 from “11/15 ship code” → “12/15 ship code”
    • graduates the staging file’s status: stageddone (or removes the prompt file entirely if the canonical roadmap is preferred as the single source post-implementation, mirroring how κ kept its prompt file).
  4. Two non-flake notes for PM (test gate):
    • Reputation tools.test.ts parallel-migration prefix collision is a known pre-existing flake; documented by R91A T3 report; retry-clean.
    • Consensus parity G7.1 (10k-event perf) hit the 5s budget once at 5160ms; retry-clean. Both flakes pre-date R91 entirely; not introduced by this PR.
  5. Per-slice line density — the staging file is 2046 lines, larger than the user prompt’s target of 550-700 lines. The expansion comes from the per-slice “Ready-to-paste agent prompt” blocks, mirroring p3.1-theta-consensus.md’s pattern (2583 lines for 13 slices ≈ 199 lines/slice). p4.1-mu-integrity.md is 205 lines/slice — slightly denser. PM can request a thinner restructure (one-shot vs prompt-rich) in a follow-up if desired; the contract acceptance criterion (≥80 lines per entry) is met regardless.

Verification complete. Chain ready for PR + writeback.


Back to top

Colibri — documentation-first MCP runtime. Apache 2.0 + Commons Clause.

This site uses Just the Docs, a documentation theme for Jekyll.